Skip to main content

22nd July –

This week’s
Opening Times

The Hall
  • Monday Closed
  • Tuesday Closed
  • Wednesday 11am - 4pm*
  • Thursday Closed
  • Friday 11am - 4pm*
  • Saturday Closed
  • Sunday 11am - 4pm*

* Last entry 3pm

The Gardens
  • Monday Closed
  • Tuesday Closed
  • Wednesday 10am - 4pm*
  • Thursday 10am - 4pm*
  • Friday 10am - 4pm*
  • Saturday 10am - 4pm*
  • Sunday 10am - 4pm*

* Last entry 3pm

Grain Store Restaurant & Bar
  • Monday 8.30am - 5pm
  • Tuesday 8.30am - 5pm
  • Wednesday 8.30am - 5pm
  • Thursday 8.30am - 5pm
  • Friday 8.30am - 5pm
  • Saturday 8.30am - 5pm
  • Sunday 8.30am - 4pm
Grain Store Café
  • Monday 8.30am - 5pm
  • Tuesday 8.30am - 5pm
  • Wednesday 8.30am - 5pm
  • Thursday 8.30am - 5pm
  • Friday 8.30am - 5pm
  • Saturday 8.30am - 5pm
  • Sunday 8.30am - 4pm
Farm Shop Café
  • Monday 9am - 4pm
  • Tuesday 9am - 4pm
  • Wednesday 9am - 4pm
  • Thursday 9am - 4pm
  • Friday 9am - 4pm
  • Saturday 9am - 4pm
  • Sunday 9am - 4pm
The Farm Shop
  • Monday 9am - 5pm
  • Tuesday 9am - 5pm
  • Wednesday 9am - 5pm
  • Thursday 9am - 5pm
  • Friday 9am - 5pm
  • Saturday 9am - 5pm
  • Sunday 10am - 4pm
Doddington at Home
  • Monday 9.30am - 5pm
  • Tuesday 9.30am - 5pm
  • Wednesday 9.30am - 5pm
  • Thursday 9.30am - 5pm
  • Friday 9.30am - 5pm
  • Saturday 9.30am - 5pm
  • Sunday 10am - 4pm
Doddington Country Clothing
  • Monday 9.30am - 5pm
  • Tuesday 9.30am - 5pm
  • Wednesday 9.30am - 5pm
  • Thursday 9.30am - 5pm
  • Friday 9.30am - 5pm
  • Saturday 9.30am - 5pm
  • Sunday 10am - 4pm
Giant Lincoln Bike Shop
  • Monday 8.30am - 5pm
  • Tuesday 8.30am - 5pm
  • Wednesday 8.30am - 5pm
  • Thursday 8.30am - 5pm
  • Friday 8.30am - 5pm
  • Saturday 8.30am - 5pm
  • Sunday 10am - 4pm
Doddington Padel Courts
  • Monday 7am - 10pm
  • Tuesday 7am - 10pm
  • Wednesday 7am - 10pm
  • Thursday 7am - 10pm
  • Friday 7am - 10pm
  • Saturday 7am - 10pm
  • Sunday 7am - 10pm
Estate Walks
  • Monday Dawn til dusk
  • Tuesday Dawn til dusk
  • Wednesday Dawn til dusk
  • Thursday Dawn til dusk
  • Friday Dawn til dusk
  • Saturday Dawn til dusk
  • Sunday Dawn til dusk

7 March 2014

Setting up the conservation studio for the Doddington Hall tapestries at the Lincoln Heritage Skills Centre

On our first morning at the Heritage Skills Centre we arrived full of excitement to an empty space that would soon be transformed into our busy tapestry conservation studio. The tapestry conservation team is made up of Elaine Owers - Tapestry conservation consultant, Amanda Davey...


On our first morning at the Heritage Skills Centre we arrived full of excitement to an empty space that would soon be transformed into our busy tapestry conservation studio. The tapestry conservation team is made up of Elaine Owers - Tapestry conservation consultant, Amanda Davey – senior project assistant, Kate French – Tapestry conservator and team leader, Sophie Minnis and Alice Brown – Assistant tapestry conservators. After being introduced we quickly got to work setting up the studio. There were numerous boxes of brand new equipment to be unpacked. In each parcel there was something new and exciting, scissors, tape measures, glass headed pins, tapestry needles, day light lamps, coloured wools and stranded cottons. It felt like Christmas. We had a trip to Doddington Hall to see the Holly bedroom where the tapestries had hung from 1762 until they were removed for conservation in 2010. It was great to get an understanding of the history of the house and tapestries and the context of the environment that the tapestries would be returning to after their conservation is completed. The two wooden frames and the first two tapestries from the set were delivered to the Heritage Skills Centre. The frames have a long history of use and have seen a number of tapestries in their life-time, this has given them a certain character of their own. We had a number of long wooden poles to choose from; ideally we were looking for straight poles with an even diameter but these poles over time have developed a few curves, perhaps not in all the right places, this quirk was overcome by inserting extra padding when rolling on the fabric. We attached adhesive backed hook Velcro® to the poles, this would give us a means of attaching both the linen support fabric and the tapestries to the frames. You can see us fighting with a piece of Velcro® in the image below trying to peel the backing off the sticky side of the Velcro® without sticking ourselves to it in the process.

Image 1- Alice and Sophie attach hook Velcro® to the wooden poles.

We then turned our attentions to preparing the linen (scrim) support fabric, this required scouring at 90◦C to shrink the fabric and remove any dressings and then carefully pressing to keep the grain of the fabric straight, to do this we made our own giant ironing board by stretching a blanket and cotton sheet over a table. We hand seamed lengths of the linen together to have enough to be slightly bigger than each tapestry. Finally we attached fabric aprons with loop Velcro® sewn on, to both ends of the linen, which would allow us to secure it to the tapestry frame.

Image 2- Amanda, Alice, Kate and Sophie stitching the linen to the aprons.

We then turned our attentions to the tapestries themselves. There are six main tapestries in total, plus a number of small fragments, Elaine our consultant had chosen two for us to start with, we have come to know them as 'The Cobbler' and the' Bagpiper and Dancing Dog'. We spent a couple of days crawling around on our knees with the tapestries rolled out on dust sheets on the floor (tables just aren't big enough!) taking photographs and recording the damage and making estimates of just how long the stitching work is going to take. We then attached aprons like those on the linen to one edge of each tapestry, only then framing up could begin. First we rolled our linen onto the centre pole of each of the two frames, making sure to keep the grain straight; it was then the turn of the tapestries. Due to the way tapestries are woven, the way in which they have been hung and their age usually means that a tapestry will have stretched and distorted making it almost impossible to impose straight lines, these tapestries were no exception. We had the added difficulty that both had large sections cut out of them to accommodate the Holly Bedroom fireplace! We slowly rolled each tapestry onto the back roller of the frames adding padding and smoothing the tapestry where needed to try to keep the weave as straight as possible. The linen was then stretched across to the front pole and the tapestry flapped over onto it allowing us to attach the tapestry to it with our stitching. We will work through the tapestry rolling it slowly onto the linen as we go. We are now ready to get stitching!

Image 3- Sophie, Kate, Elaine and Alice rolling 'The Cobbler' onto one of the frames.

Image 4 - Both the tapestries on their frames and pinned onto the first sections of linen ready for stitching.

For images and weekly updates on the conservation project, follow us on Instagram at

conservation_at_doddington

.

1 / 4
2 / 4
3 / 4
4 / 4

A little more Doddington in your inbox

Be the first to know about about everything happening at Doddington Hall. Fresh ideas, seasonal stories, event insights, and more. 
No spam, just the good stuff.

We use cookies

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking 'Accept All', you consent to the use of ALL the cookies.

Several cookies are required for the site to function (such as this acceptance form). These enhance the experience of using the site by remembering certain actions and allowing core functionality.

laravel-session
Stores your session information to keep you logged in
XSRF-TOKEN
Security token to prevent cross-site request forgery attacks

This site uses tracking cookies to collect anonymous information such as the number of visitors to the site and the most popular pages.

_ga
Google Analytics cookie used to distinguish visitors.